Day 3 (5-18-05)

Basement walls!

Footer forms removed.

Horizontal rebar wired to vertical rebar for walls

Interior and exterior drainage tiles placed.

Footers for porch formed and poured

Forms for walls placed

Forms for porch footers removed

Porch wall forms placed with insulation for brick ledge

Walls poured (took 6 concrete trucks)