Day 3 (5-18-05)
Basement walls!
Footer forms removed.
Horizontal rebar wired to vertical rebar for walls
Interior and exterior drainage tiles placed.
Footers for porch formed and poured
Forms for walls placed
Forms for porch footers removed
Porch wall forms placed with insulation for brick ledge
Walls poured (took 6 concrete trucks)
Footer forms removed.
Horizontal rebar wired to vertical rebar for walls
Interior and exterior drainage tiles placed.
Footers for porch formed and poured
Forms for walls placed
Forms for porch footers removed
Porch wall forms placed with insulation for brick ledge
Walls poured (took 6 concrete trucks)